Have you found your ideal blouse-jeans combo yet?Also,need jeans like skinny or bootcut styles that fit perfectly?
Have you found your ideal blouse-jeans combo yet?Also,need jeans like skinny or bootcut styles that fit perfectly? Have you found your ideal blouse-jeans combo yet?Also,need jeans like skinny or bootcut styles that fit perfectly?
Cart(0)
Home Retro Skirts A-line Retro Skirts
Product Details
Ahoy Mateys! From the Mind of Sid Meier, The Golden Age of Buccaneering has returned with Pirates! Gold!

You'll criss-cross your way along the 17th century Spanish Main in search of all-new adventures.

You'll lead a crew of hot-blooded buccaneers into rollicking harbour towns. And risk your booty and your life plundering enemy ships!

Hunt for magnificent treasures! Unravel the mysteries and clues of your adventure! Even battle your way through enemy waters on grueling rescue missions!

Will you win your rightful place in history? Or will you end up shipwrecked on a distant island? The answer can only be found in the swashbuckling Pirates! Gold.

Features

  • Experience the untamed era of piracy through stunning new VGA/Super VGA art and graphics!
  • Feel the ring of crossing swords and the boom of mighty cannon with enhanced sound features!
  • Skewer scurvy rogues with enhanced sword-fighting capabilities!
  • Gain power, prestige or even the hand of the governor’s daughter!
  • Bombard enemy ships!
  • Explore more coastal towns, each with it's own dangers
  • Includes the original Sid Meier's Pirates! game! and bonus Map, Soundtrack and Cheat Sheets.

System Requirements

Windows

MINIMUM:
  • OS: Windows XP / Vista / 7 
  • Processor: 1.0 GHz Processor 
  • Memory: 512 MB RAM 
  • Graphics: 100% DirectX compatible graphics 
  • Hard Drive: 100 MB available space 
  • Sound Card: 100% DirectX compatible card or onboard sound
RECOMMENDED:
  • OS: Windows 7 
  • Processor: 1.5 GHz Processor 
  • Memory: 1 GB RAM 
  • Graphics: 100% DirectX compatible graphics 
  • Hard Drive: 100 MB available space 
  • Sound Card: 100% DirectX compatible card or onboard sound

Mac OS X

MINIMUM:
  • OS: OS X Leopard 10.7 
  • Processor: 1.0 GHz Processor 
  • Memory: 512 MB RAM 
  • Graphics: 3D graphics card or onboard graphics compatible with OpenGL 
  • Hard Drive: 100 MB available space 
  • Sound Card: 100% CoreAudio compatible card or onboard sound
RECOMMENDED:
  • OS: OS X Leopard 10.7 or newer 
  • Processor: 1.5 GHz Processor 
  • Memory: 1 GB RAM 
  • Graphics: 3D graphics card or onboard graphics compatible with OpenGL 
  • Hard Drive: 100 MB available space 
  • Sound Card: 100% CoreAudio compatible card or onboard sound

SteamOS Linux

MINIMUM:
  • OS: Ubuntu 14.04 LTS 
  • Processor: 1.0 GHz Processor 
  • Memory: 512 MB RAM 
  • Graphics: 100% OpenGL accelerated card or onboard graphics 
  • Hard Drive: 100 MB available space 
  • Sound Card: Any ALSA supported card on onboard audio
RECOMMENDED:
  • OS: Ubuntu 14.04 LTS 
  • Processor: 1.5 GHz Processor 
  • Memory: 1 GB RAM 
  • Graphics: 100% OpenGL accelerated card or onboard graphics 
  • Hard Drive: 100 MB available space 
  • Sound Card: Any ALSA supported card on onboard audio

Sid Meier's Pirates! Gold Plus (PC/MAC/LINUX)

  • SteamKey

$ 33.71

Please select combo product attributes
The combo subtotal is $,SAVE$
Unavailable

You May Also Like

Cart
Have you found your ideal blouse-jeans combo yet?Also,need jeans like skinny or bootcut styles that fit perfectly?
Your cart is currently empty.